No. | 軟體名稱 | 問題類型 | 問題內容 | 回答內容 |
---|---|---|---|---|
1 | ETAP PowerStation 電力系統分析 | 其他 | 您好,先前本單位尤工程師有與您連絡過,想再請教ETAP軟體是否可透過API進行軟體溝通,如本公司自行開發一個網頁,網頁內容之單線圖與ETAP一致,透過網頁發送命令ETAP軟體自動啟動POWER FLOW(負載潮流)模擬、停止,並將模擬結果回傳至網頁顯示;或在網頁加入(或減少)一個匯流排(或電纜、變壓器、發電機…等設備),則下命令ETAP軟體同步增加(或減少)一個匯流排/電纜/變壓器…等,是否有此API可與ETAP溝通,敬請回覆,謝謝。 | 目前不可以歐 |
2 | ETAP PowerStation 電力系統分析 | 操作相關 | 無法New Project | Windows 登入帳號不能使用"Admin"登入 |
3 | ETAP PowerStation 電力系統分析 | ETAP 5.0.3是否可安裝於WIN 7 | OK | |
4 | ETAP PowerStation 電力系統分析 | 操作相關 | Could we run the PV system if I don't buy the single phase system ? | Yes |
5 | ETAP PowerStation 電力系統分析 | 操作相關 | 此軟體繪製的圖是否可轉為CAD | http://etap.com/data-exchange/data-exchange-software.htm Export to DXF (AutoCAD / MicroStation) |
6 | ETAP PowerStation 電力系統分析 | 操作相關 | We Engineering Consultants, Ltd, have plenty design works as MRT and Railway Electrical calculation. Hence, we really need some module for simulation for Autotransformer, LE BLANC transformer, Scott transformer and 24-pulse converter. Could you provide the practical module? | |
7 | ETAP PowerStation 電力系統分析 | 安裝問題 | 請問為何有 Key Code 和 Hardware USD lock | 本軟體因十分複雜 購買時 分 1.Bus 容量 2.模組 3.單機版 網路版 4.人數 5.不同版本 6.公司資訊 所以Hardware USD lock 是確認 該公司有購買,同時也顯示該公司資訊 而Key Code 則決定 1.Bus 容量 2.模組 3.單機版 網路版 4.人數 5.不同版本 |
8 | ETAP PowerStation 電力系統分析 | I want to know the function of ETAP Wind Turbine 1. How many wind turbine type in ETAP? 2. Can I add new wind turbine model in ETAP? I need this information for decide purchase. | Please see help | |
9 | ETAP PowerStation 電力系統分析 | 操作相關 | ETAP 電壓閃爍分析功能在哪裡? Is there the voltage flicker analysis in ETAP? If ETAP had this function, please tell me how to simulate and liste the analysis procedures . | ANS1: ETAP motor starting performs voltage dip calculations as a result of starting of motors. I'm not sure if this is the user's question. Video tutorials are included in the following link: http://etap.com/support/faqs-tutorials-topic.htm#motorstartinganalysis ANS2: User can perform voltage flicker analysis using motor starting studies. Video tutorials are available (12 & 13): http://etap.com/training/tutorials-training-videos.htm |
10 | ETAP PowerStation 電力系統分析 | 1. Can transfer Powerplot file into ETAPSTAR? 2. If yes, How? | Yes | |
11 | ETAP PowerStation 電力系統分析 | 操作相關 | The power company supply the 3 phase voltage to customer. But, the railway power system needs 2 phase voltage in Taiwan. So, The 3 phase voltage must transform to 2 phase voltage for railway power system. plaese refer to attached. the transformer primary is delta(3 phase), the secondary is M and T phase (2 phase) The phase angle between M phase and T phase is 90 degree. | I consulted with others in OTI and the configuration you have described cannot be modeled in ETAP. Workaround is not available at this time. We have added Scott / T / Open Delta transformer to ETAP and will add LeBlanc Transformer to ETAP 12 release. |
12 | ETAP PowerStation 電力系統分析 | 操作相關 | ETAP 電壓閃爍分析功能問題 Is there the voltage flicker analysis in ETAP? If ETAP had this function, please tell me how to simulate and liste the analysis procedures . | ANS1: ETAP motor starting performs voltage dip calculations as a result of starting of motors. I'm not sure if this is the user's question. Video tutorials are included in the following link: http://etap.com/support/faqs-tutorials-topic.htm#motorstartinganalysis ANS2: User can perform voltage flicker analysis using motor starting studies. Video tutorials are available (12 & 13): http://etap.com/training/tutorials-training-videos.htm |
13 | ETAP PowerStation 電力系統分析 | 重新啟動 | 關於安裝有發生 code 過期的問題。 | 需新的永久Code,國外已回覆 |